Aluminum alloy suspension crane is a kind of light lifting equipment, which is made of aluminum alloy material and has the characteristics of light weight, high strength and corrosion resistance. Aluminum alloy suspension cranes are mainly composed of lifting machinery, suspension devices, motors and other parts, and can be used for suspension and handling of light items in factories, warehouses and other places.
The suspension crane removes the goods from the pick-up port of the pick-up equipment or storage equipment, stops after running the goods to the designated position, and aligns the delivery port of the pick-up equipment with the hoisted objects for lifting. When the hoisted object approaches the pick-up port, the suspension crane feeds the hoisted object. After the hoisted object enters the pick-up port, the hoisting rope is released, and the lifting trolley moves forward along the track of the pick-up machine or the overhead line of the factory building. Move until the hoisted object is lifted to the desired pick-up position. According to the order of feeding, bypass the fixed pulley and lower the power cut respectively. The driver lands the hoisted object by means of the controller, and then moves the hoisted object to the transport equipment along the overhead line.
Specification parameters of aluminum alloy suspension crane:
● Model: BZ-L.
● Lifting capacity: 500kg.
● Lifting height: general user needs 4m.
● Jib length: general user needs 4m.
● Working range: 800mm~1300mm.
● Work type: divided into single girder, double girder, suspension type, bridge type, etc.
● Span: 5.5m ~ 35m.
● Lifting height: 0~80m.
● Jib length: 0.5m ~ 12m.
● Working speed: 0.5m/s~12m/s.
Precautions for aluminum alloy suspension cranes working in purification workshops:
● Before using the hanging crane in the clean room, turn on the power and check whether the components of the hanging crane in the clean room are safe and reliable.
● Before the clean room is hung and hoisted, the hoisted goods must be bound firmly to ensure that the hoisted goods are not overweight before hoisting.
● Press the lifting button, and when the hanging steel wire rope in the clean room is tensioned, and ensure that there is no abnormality, continue to press the lifting button to move the goods to the place you want to move.
● After the lifting operation of the hanging crane in the clean room is completed, the hook of the hanging crane in the clean room should be raised to a height of more than two meters above the ground, and then the main power supply should be turned off.