How to Install Floor Mounted Jib Crane

| How to Install Floor Mounted Jib Crane

Description:
Floor mounted jib crane is a kind of lifting equipment with telescopic arms. It is supported by columns and realizes the lifting and transfer of materials through telescopic arms.
Category:
Created:
2023-03-06 16:24

Floor mounted jib crane is a kind of lifting equipment with telescopic arms. It is supported by columns and realizes the lifting and transfer of materials through telescopic arms. This equipment has the characteristics of compact structure, easy operation and strong lifting capacity, and is suitable for various working environments and operation needs. Floor mounted jib crane usually consists of a column, telescopic arm, electric hoist, traveling device and control system. All parts work together to achieve efficient lifting operations.

Floor mounted electric jib crane

Floor mounted jib crane installation steps

  1. Before installing the floor mounted jib crane, foundation construction needs to be carried out first. Select a suitable location for foundation excavation and pouring based on the size and weight of the equipment. The foundation should be flat, solid, and able to withstand the weight and vibration of the equipment. At the same time, it is also necessary to reserve the installation location and walking track of the equipment.

  2. After the foundation construction is completed, the installation of the columns begins. The column is the main supporting structure of the floor mounted jib crane, and its verticality and stability need to be ensured. During the installation process, tools such as a spirit level and theodolite should be used for precise measurement and positioning to ensure that the verticality of the columns meets the requirements. At the same time, the columns also need to be fixed and reinforced to prevent them from shaking or tilting during use.

  3. After the column installation is completed, proceed to install the telescopic arm. The telescopic arm is an important part of the floor mounted jib crane, which is responsible for lifting and transferring materials. When installing the telescopic arm, it needs to be assembled and debugged according to the requirements of the equipment manual to ensure that its structure is stable and its movements are flexible. At the same time, the telescopic arm also needs to be lubricated and maintained to extend its service life.

  4. After the telescopic arm is installed, install the electric hoist. The electric hoist is a lifting device for floor mounted jib crane, which is responsible for lifting and lowering materials. When installing the electric hoist, ensure that its installation position is accurate, firmly fixed, and the connection with the telescopic arm maintains good sealing. At the same time, the electric hoist also needs to be debugged and inspected to ensure that it is working properly, safely and reliably.

  5. Finally, install and debug the control system. The control system is the brain of the floor mounted jib crane and is responsible for controlling the movement and operating status of the equipment. When installing a control system, ensure that it is properly wired, fully functional, and coordinated with the rest of the equipment. During the debugging process, each function should be tested one by one to ensure that the control system can accurately and stably control the operation of the equipment.

Column slewing jib crane

Use and maintenance of Floor mounted jib crane

  1. Operators should receive professional training and hold corresponding certificates to ensure that they are proficient in the operation methods and precautions of the equipment.

  2. During use, the operating procedures should be strictly followed to avoid overloading, speeding and other violations.

  3. Carry out regular maintenance and upkeep on the equipment, check the operating status and wear of each component, and replace damaged parts in a timely manner.

  4. During use, attention should be paid to observing the operating status and abnormal conditions of the equipment. If any abnormalities are found, stop the machine immediately for inspection and processing.