Stainless steel workstation jib crane is a kind of lifting equipment, mainly used in workstations, production lines and other places that require frequent lifting. It is made of stainless steel and is corrosion-resistant and easy to clean. It is suitable for environments with high hygiene requirements, such as food processing plants, pharmaceutical companies, etc. The crane usually consists of a jib and an electric hoist. The jib can rotate 360 degrees. The electric hoist can rise and fall along the jib to lift and carry goods. The stainless steel workstation jib crane is easy to operate, safe and reliable, and can improve work efficiency and ensure product quality. Proper installation of a jib crane is critical to its proper operation and service life.
Preparations before installation
1. Check the crane equipment: Before installation, the crane equipment should be fully inspected to ensure that the equipment is intact and meets the installation requirements.
2. Prepare installation tools: Prepare required installation tools, such as screwdrivers, wrenches, levels, etc.
3. Determine the installation position: According to the layout and needs of the workstation, determine the installation position of the jib crane to ensure that the crane can cover the required work area.
Installation steps
1. Install the basic bracket: Install the basic bracket according to the predetermined position. Make sure the stand is installed smoothly and levelly, and use a spirit level to calibrate it.
2. Install the swing arm: Install the swing arm on the basic bracket and ensure that the connection between the swing arm and the bracket is firm and stable. At the same time, check whether the rotation range of the swing arm meets the requirements.
3. Install the lifting mechanism: Install the lifting mechanism on the swing arm to ensure that the connection between the lifting mechanism and the swing arm is firm and stable. At the same time, check whether the lifting, telescopic and other functions of the lifting mechanism are normal.
4. Install the electrical system: According to the electrical drawings of the crane, correctly connect the power lines and control lines. Ensure that electrical systems are safe, reliable and comply with relevant regulations.
5. Commissioning and testing: After completion of installation, the crane will be fully commissioned and tested. Check whether the various functions of the crane are normal and whether the operation is smooth. If problems are found, adjustments and repairs should be made in time.
Installation precautions
1. Strictly comply with the installation instructions: During the installation process, the installation instructions of the crane should be strictly followed, and the installation steps should not be changed at will or important steps should be omitted.
2. Ensure safety: During the installation process, the safety of the work area should be ensured to avoid accidents. At the same time, operators should have corresponding operating skills and safety awareness.
3. Check the quality of the equipment: Before installation, a comprehensive inspection of the crane equipment should be carried out to ensure that the quality of the equipment meets the requirements. If you find that there are quality problems with the equipment, you should contact the manufacturer in time for processing.
4. Keep it clean: During the installation process, the work area should be kept clean to prevent debris and dust from entering the interior of the crane and affecting its normal operation.